User Tools

Site Tools


en:objrep

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
en:objrep [2013/01/13 15:17]
gaforka
en:objrep [2013/01/13 15:37]
gaforka
Line 231: Line 231:
 Estimated duration of development of advanced algorithms: 6 months\\ Estimated duration of development of advanced algorithms: 6 months\\
 Estimated costs of development of advanced algorithms: 40 000 EUR Estimated costs of development of advanced algorithms: 40 000 EUR
-==== Phase 6: Further development of ONTNET====+==== Phase 6: Further development of ONTNET ====
  
 Further optional development ONTNET would consist of working on improving the integrity and relationships of ONTNET points with the aim of improving the total usability of the object repertory. In theory, this work is indefinite, therefore the range of such work can only be considered in face of practical considerations and when such point of the project development is reached. Further optional development ONTNET would consist of working on improving the integrity and relationships of ONTNET points with the aim of improving the total usability of the object repertory. In theory, this work is indefinite, therefore the range of such work can only be considered in face of practical considerations and when such point of the project development is reached.
en/objrep.txt · Last modified: 2013/03/13 16:14 by legatum